top of page
蘭陽 (1).png
located.png

 Lanyang Hydropower System,
Yilan, Taiwan

Lanyang Hydropower System documents how the forces of nature are transformed into electricity. Water, gravity, and the landscape create a soundscape where wind, flowing water, vegetation, and turbines exist in balance. Unlike the industrial noise of thermal power plants, these sounds are closer to the essence of ambient and drone, revealing that the origins of electronic music lie not only in machines, but also in the rhythms of nature.

大潭時間軸.png
new天埤機組廠房內部.png
flower.jpg
Hydraulic Turbine.wavHydraulic Turbine 水力發電渦輪機.wav
0:00 / 0:00

ARCHIVE NO. 007

Hydraulic Turbine

Location: Power Plant
Recorded: 2026.03.20
Frequency Range: 47 Hz – 17 kHz

flower.jpg
Sand Filtration Unit 砂濾設備.wav
0:00 / 0:00

ARCHIVE NO. 008

Sand Filtration Unit

Location: Power Plant
Recorded: 2026.03.20
Frequency Range: 47 Hz – 18 kHz

flower.jpg
High voltage power tower 高壓電塔.wav
0:00 / 0:00

ARCHIVE NO. 006

High Voltage Power Tower

Location: Power Plant
Recorded: 2026.03.20
Frequency Range: 47 Hz – 15 kHz

flower.jpg
Wind in turbine hall 渦輪機風聲.wav
0:00 / 0:00

ARCHIVE NO. 005

Wind in Turbine Hall

Location: Power Plant
Recorded: 2026.03.20
Frequency Range: 47 Hz – 16 kHz

Track botton.png
音波 copy.png
flower.jpg
蘭陽.wav
0:00 / 0:00

Lanyang Hydropower System - Sonic Archive

A Timeline Of  Taiwan's Power Development
Explore Taiwan’s power infrastructure through time.

1921

1941

1950

1977

1985

2005

2020

Present

Lanyang Hydropower

From Field Recording to Sonic Translation

Electric Musicology develops a sonic translation for each documented power site. These audio pieces are neither conventional music tracks nor simple reproductions of the original soundscape. Through editing, sampling, classification, and recomposition, each translation interprets the distinctive sonic structure shaped by the site’s energy system, operating equipment, and acoustic characteristics.


The Lanyang Hydropower Plant translation begins with the operation of its hydropower units and surrounding water environment, demonstrating how field recordings can be transformed into sound-design materials with rhythm, texture, and spatial depth.

H1-黃暈光.png
IMG_9203 (1).jpg

In electronic music, sound does not emerge solely from machines. Sometimes it is shaped by
gravity, flowing water, and the slow passage of time. For Ambient and Drone music, these
gradually evolving environmental sounds are often among the most essential sonic sources.

Located in Yilan, Lanyang Hydropower System  is one of Taiwan Power Company’s most
important hydroelectric systems in eastern Taiwan, drawing its energy from the Lanyang
River watershed. The Tianpi  Power Station began operation in 1921 with three generating
units, while the Yuanshan Power Station was completed in 1941. As electricity demand
increased alongside the development of the Yilan region, Japanese planners harnessed the
abundant rainfall and dramatic elevation changes of the upper Lanyang River to establish a
network of hydropower facilities. Following World War II, the system was taken over by
Taiwan Power Company and remains in operation today.

Unlike large reservoir-based power plants, Lanyang operates as a classic run-of-river
hydroelectric system. Through diversion weirs, water channels, regulating ponds, and
penstocks, natural elevation differences are transformed into electrical energy. In many ways,
hydropower does not create energy, it converts gravity into electricity.

The Tianpi Unit, located in the mountainous area of Yuanshan Township, centers around
Tianpi Lake, a natural lake later integrated into the hydroelectric system as a regulating
reservoir. While its calm surface appears to be part of the surrounding landscape, it plays a
crucial role in storing water, stabilizing supply, and regulating flow. Here, wind, water,
vegetation, and hydraulic infrastructure merge into a distinctive acoustic environment. Unlike
the steady low-frequency hum of a thermal power plant, Tianpi resembles an Environmental
Drone shaped by the rhythms of the natural world.

The Yuanshan Unit serves as one of the key sites where potential energy is transformed into
electricity. Water rushes downhill through penstocks, enters the turbines, and drives
generators into motion. Here, the forces of nature are translated into energy through
engineering, revealing the physical process behind every electrical current.

If a thermal power station can be imagined as a giant oscillator, then a hydroelectric plant is
perhaps better understood as a monumental metronome driven by gravity itself. Water,
landscape, and time all participate in the formation of sound, giving Lanyang a unique sonic
character that exists somewhere between natural environment and infrastructure.

Here, electricity is not merely a source of energy, it is a continuously flowing environmental
sound.

IMG_9176 (2).jpg
IMG_9196 (2).MOV
IMG_9195 (3).mov
bottom of page